SAMPLE PROJECTS
_
KHALIFA FUND
MAKEEN TOWER
VISION TOWER
DUBAI POLICE MULTI PURPOSE HALL
DUBAI POLICE HQ EXECUTIVE OFFICE
DUBAI TAXI HQ
Below are some completed and ongoing projects:
Replacement of existing damaged water proofing system at Jebel Ali Trade Zone
EFR 0720191201
Construction of cable trench at Fujairah Data Center
EFR-02202006
Shed Flooring, Ramp and Chain-link Fence Establishment including associated works at Bateen Exchange – AUH.
EFR-01202203
Removal of Sand Dunes from Various Exchange Sites in DXB
EFR-02202008
Enhancement Works Related To Existing Storm Water Network System At Aweer Stores-DXB under
PO 1107762
Rectification of roof water leakage in VMC Ramool
EFR-03202011
Replacement of Damaged Roof Tiles at RAK HRB-Level-03
EFR-05202009Renovation and Facelift of Etisalat VMC at Musaffah, AUH
EFR-1107318
Provision of Safety Handrails on Radome Base and Generator & LV Room Roof at HRB (HOBA & DEIRA)
EFR-08202003
Crack Repairing & Repainting Works with other Associated Works at Etisalat DSO Exchange
EFR-07202009
Replacement of Damaged Doors at Various Sites - Abu Dhabi, AAN & DXB
EFR-08202002Replacement of damaged PVC socket of Roof water drain line at TCN Data Center in Dubai
PO-1111846
Provision of Safety Roof Mounted Horizontal Life Line System & Skylights Protection at VMC AUH.
EFR-03202102
Provisioning of Cable Entry (Lead in) into Various Buildings Including Coring and Related Activities at Dubai Region.
EFR-09202007PORT SAEED: Replacement of Existing Granite Cladding at External Elevation & Associated Works in Etisalat Port Saeed
Exch.
PO-1113613
Rectification of Drainage Block & associated civil and plumbing works including water jetting for VMC, L&D, Rumool, DXB.
PO-1116134
Replacement of Existing Waterproofing System at five (5) Sites in Dubai
EFR-01202201
Waterproofing works for Roof & Balcony at Ajman CC – Ajman
EFR-11202007DEIRA COMPLEX: Replacement of concrete projection & metal louvers with supply & fixing of heavy-duty powder coated aluminium tube & aluminum mesh with approved
PO 1111584
DEIRA: Shifting of Storm Water Pipes Inside the Metal Louvers in Deira Old (Block -2) - DXB.
EFR - 08202120Rectification of Water Leakage in Basement at Hor Al Anz – DXB.
EFR-09202102
Supply and Installation of faomcrete in order to fix the slope defects observed at the roof of computer lab building.
PO 570033720
Enhancement of Jabel Ali Earth Station Buildings
PO 1115554
Replacement Of Existing Ceramic Tiles Cladding & Associated Works At Etisalat Jebel Ali Business Center, Dubai
PO 1117502